0:00 Ladies and gentlemen, good day and welcome to NHPC Limited Q4 FY26 earnings conference call hosted by ARA Securities India Private Limited. As a reminder, all participant lines will be in the listen volume mode and there will be an opportunity for you to ask questions after the presentation concludes. Should you need assistance during the conference call, please sign an operator by pressing start then zero and touchstone phone. Please note that this conference is being recorded. I now have conference over to Mr. Rupes Senkee from ARA Securities India Private Limited.

0:35 Thank you and over to you sir. >> Yeah. Yeah. Good afternoon everyone. Uh on behalf of ARA securities, we welcome you all for the Q4 FI26 conference call of NHPC. I take this opportunity to welcome the management of NHPC represented by Mr. Sanjay Kumar Singh director projects. Mr. Supraash Adikari director technicals Mr. Mahesh Kumar Sharma, director of finance. So we will begin the call with a brief brief overview by the management followed by Q&A. I will now hand over the call to Mr. Sanjay Kumar Singh, director of projects for his opening remarks. Over to you sir.

1:16 >> Good afternoon friends. The NHBC board has adopted annual financial results for the period ended 31st March 26th in its meeting held on 15th May 26 and the same has already been communicated to the exchanges. By now I hope you all would have gone got chance to go through the quarterly and yearly set of numbers. First I will touch upon major highlights of the financial results and the detailed growth plan. Further detailed analysis of the results shall be shared by our director of finance Shri Mahesh Kumar Sharma.

1:57 Brief highlights of the consolidated financial results and important update on the company are as under during FI26 our power stations have achieved generation generation of 29,619 million units as against 25,548 million units generated in corresponding period of the previous year which is higher by about 16% or 47 71 million rates. This is mainly due to the commissioning of Parvati 2 power station and subsequent increase in generation of Parvati 3 power station. Commissioning of Carnesar solar power station. Part commissioning of subansiri lower project. Increase in generation of UDI1 power station and power stations of NSDC.

2:50 Our path for financial year 26 stands at 74.75% against the corresponding previous period p of 78.87% which is about 4% lower. This is mainly due to shutdown for some period in Doolasi, Chamira 3, TLDP4 power station on account of MIV repair works, restoration of sale beams and repair of radial gates etc.

3:22 During financial year 26, company has earned revenue from operations of rupees 11,615 cr as against rupees 10,380 crores in the corresponding pre previous period which is about 12% higher. During financial year 26 company has earned pat of rups 3,766 cr as against rups 37 cr of corresponding period which is 25% higher. I am very pleased and proud to share that we have commissioned four units of subansri lower project 250 megawatt each out of total eight units.

4:08 Remaining four units are expected to be commissioned one by one till March 27. The anticipated cost of the project is Rs 30,72 cr and we have incurred Rs 26,92 cr till March 26. Investment approval for implementation of URI 1 stage 2 H project of 240 megawatt and Dulasi stage 2 H project of 260 megawatt in UT of Jammu and Kashmir at an estimated cost of rupees 2779 cr and rupees 2994 cr respectively at completion level has been accorded by NHPC board on 20th February 26. Six. Further, an implementation agreement has been signed between NHBC Limited and Jammu and Kashmir State Power Development Corporation Limited on 27 March 26 for development of these projects. Civil contracts for these projects have also been awarded in March 26 and scheduled completion of both the projects is November 29th.

5:22 Cabinet Committee on Economic Affairs has approved investment of rupees 26,70 cr for construction of Kamla Achie project uh of capacity 1720 megawatt in Arunachal Pradesh on 8th April 26. The project will be implemented through a joint venture company between NSPC Limited and the government of Arnachal Pradesh. The formation of subsidiary is in progress. Further environment and forest clearances are also in in process for the project. In respect of Dang multi-purpose project of 2,880 megawatt all major contracts have been awarded including the dam package of rupees 14,446 cr which has recently been awarded in the month of April 26.

6:20 We have already shared that we have achieved the crucial nala diversion a significant stride towards ensuring all weather road access to the project site and the work is going on in full-fledged manner. The estimated cost of the project is rups 31,8676 cr which includes grant of rups 6,716 cr for flood moderation and enabling infrastructure works out of which we have already incurred rups 454 cr till March 26 and the schedule completion of the project is February 32 in respect of these six H projects uh of 500 megawatt capacity. The work is progressing well at site. Overall 72% physical progress of the project has been achieved. The estimated cost of the project is rupees 9,167 cr out of which we have already incurred expenditure of rups 5,231 cr till March 26. The expected commissioning schedule of the project is September 29th.

7:36 Gel Power Corporation Limited is run uh Rangit 4 H project one of 20 megawatt is also progressing well. Overall 96% physical progress of the project has been achieved. Boxing off of all three units have been completed. The project is expected to be commissioned by November 26th. The estimate costed cost of the project is rupees 1,889 cr out of which we have already incurred expenditure of rupees 1792 cr till March 26th. Further we are in pro process of merger of JPCL with NHBC and second motion applicable has already been filed with the ministry of corporate affairs in respect of roughly achie project of 850 megawatt in UT or GNK the work is progressing well at the project site overall 29% physical progress of the project has been achieved the estimated cost of the project is rupes 5,282 cr and we have incurred expenditure of rups 1 15308 cr till March 26 the project is expected to be commissioned by november 28th presently NHPC through its subsidiary CPPL is executing three projects in Chennaw that is in UT of JNK construction of parkulachi project of thousand Megawatt is progressing well. Overall 80 80% physical progress of the project has been achieved. The estimated cost of the project is rupees 12,728 cr out of which we have incurred expenditure of rupees 9,141 cr till March 26. The project is expected to be commissioned by ma by fourth quarter of financial year 27. In respect of Kiru H project of 624 megawatt overall 82% physical project of the project progress of the project has been achieved we have incurred expenditure of rups 3,637 cr till March 20 26 out of the estimated cost of rups 4 5,49 cr and estimated Commissioning of the project is fourth quarter of financial year 27. In respect of que project of 540 megawatt the work is progressing well at site. Overall 33% physical prog progress of the project has been achieved. The estimated cost of the project is rupes 4526 cr out of which we have incurred expenditure of rupees 1,78 cr till March 26 and the project is scheduled to be commissioned by March 28.

10:50 The restoration work of the five power station is under progress and it is expected that the power station will start generation in June 26. Apart from above under construction projects, NHPC is also actively pursuing to start works of projects such as SAL code of 1856 megawatt, Subansri of 60, Subansri Upper of 165 megawatt and Italian of 3,97 megawatt which are at different stages of clearances in respect of 1,00 megawatt capacity solar Our projects allotted under CPSU scheme t2. We have already commissioned 3300 megawatt project in the kaneer, Rajasthan. Further 100 megawatt project in Andhra Pradesh and 600 megawatt project in Gujarat are expected to be commissioned by June 26th and December 26 respectively. Our other construction so solar projects like 40 megawatt solar power project in Ganjam Orisa and 50 megawatt floating solar project in Kerala are expected to be completed by October 26th and March 27th respectively.

12:13 For the two projects of 200 megawatt grid connected s solar photovoltic power projects located in Gujarat state electricity board corporations limited Ahri park at Kavala Gujarat are expected to be commissioned by June 26 and December 26 respectively. NHPC is exploring to develop pump storage projects in the state of Maharashtra, Orisa, Madhya Pradesh, Gujarat, Chhattisgarh, Rajasthan and Andhra Pradesh. Currently, we have 18 gawatt PSPs which are at DPR of PFR stage.

12:50 Further, we are expecting to start construction of Indra Omareshwar PSP of 640 megawatt in the current financial year. This is all from my side. Now I request that finance Shir May Sharma GI to discuss financial results in detail. Thank you. Good afternoon friends. I am going to share with you detailed quarterly and annual set of numbers the detailed analysis. The NHPC board has adopted an annual financial results for the period ended 31st March 26 in its meeting held on 15th May 26 and the same has already been communicated to exchanges. Detailed highlights of the concentrated financial results and important updates on the company are as under during FY26. Our power stations have achieved generation of 29619 million units as against 25548 million units generated in corresponding period of the previous year which is higher by about 16% or 4071 million units. During fourth quarter FY26, our power stations have achieved generation of 3770 million units as against 3150 million units generated in corresponding period of the previous year which is higher by about 20% or 620 million units. Our PF for FI26 stands at 74.75% against the corresponding previous period PF of 78.87% 87% which is about 4% lower. Our PAF for fourth quarter FI26 stands at 62.47% against the corresponding previous period PF of 66.84% which is about 4% lower. For FI26 company has earned revenue from operations of rupees 11615 cr as against rupes 1038 cr in the corresponding previous period which is about 12% higher or by rupees 1235 cr. The increase in revenue is mainly due to higher generation on account of commissioning of pawati 2 power station part commissioning of subunri lower project and commissioning of karniser solar power station. During Q4 FI26 company has earned revenue from operations of rupees 2816 cr as against rupees 2347 cr in the corresponding previous period which is about 20% higher or by rupees 469 cr. The increase in revenue is mainly due to higher generation on account of newly commissioned power stations. Other income for FI26 is of the order of rupees 107 cr in comparison to rupees 1235 cr during the corresponding pre previous period which is about 13% lower or by rupees 164 cr. This is mainly due to decrease in realization of business interruption loss against insurance claim by rupees 46 cr when related to Tista 5 power station. Current period is nil and previous period rupees 46 cr.

15:55 This decrease is offset by increase in income from insurance claim by rupees 3 to 1 cr mainly in respect of pista 5 power station rupees 254 cr and paroti 2 power station rupees 1 121 cr. Other income for Q 4 FI26 is of the order of rupees 305 cr in comparison to rups 21 cr during the corresponding previous period which is about 45% higher or rupes 94 cr. This is mainly due to increase in income from insurance claim by rupees 69 crores mainly related to tistafi power station and increase in dividend income by rupes 32 cr. During FI26 the generation expenses have gone up from rupees 79 cr to rupees 8 to1 cr that is by rups 22 cr which is due to higher water size on account of higher generation in power stations situated in GNK and Uttra during Q4 FY26 the generation expenses have gone up from rupes 98 cr to rupees 103 cr that is by rupees 5 cr which is due to higher water size on account of higher generation in power stations situated in JNK and Utakhan during FY226 the employee benefits expense has come down from rupes 1823 cr to rups 1498 cr that is by rupees 325 cr which is mainly due to decrease in employee remiration pay anomaly by rups 383 cr which is offset by increase due to increment da and other factors during Q4 FY26 the employee benefit expenses has come down from rupes 4 to1 cr to rupees 40 CR 402 cr that is by rups 19 cr showing marginal decrease. During FI26 there has an increase in the finance cost from rupees 1189 cr to rupees 1423 cr that is by rupees 234 cr which is mainly due to increase in interest on bonds term loans etc by rupees 87 cr related to pari to subuni lower and conditioner solar power station charged to P&L since their commissioning which is offset by decrease in interest on arbitration and court cases by rupees 67 cr. During Q4 FI26, there has been increase in the finance cost from negative rupees 12 cr to rupes 574 cr that is by rupees 586 cr which is mainly due to increase in interest on bonds term loans by rupees 359 cr mainly related to pariti subans lower and conditioner solar power station charge to profit and loss since their commissioning increase in interest on arbitration court cases by rupees 110 0 cr and interest to bank history by rupes 108 cr. During FI26 the depreciation amotization and impairment expenses have gone up from rupees 11 193 cr to rupes 1976 cr that is by rups 783 cr which is mainly due to depreciation and amotization in respect of power stations commissioned during financial year 2526. During Q4 FY26 the depreciation, amortization and impairment expenses have gone up from rupees 315 cr to rupees 642 cr. That is by rupees 327 cr which is mainly due to depreciation and amortization in the respect of power station commission during financial year 2526.

19:14 During FI26, other expenses have gone up from rupes 212 cr to rupees 4060 cr means by rupees 1 1938 cr. Uh mainly due to increase in general network excess charges by rupes 82 cr. Increase in insurance expense by rups 476 cr. Increase in losses out of insurance gains by rups 225 cr. Increase in provision by rups 168 cr and increase in rnm expenses by rupees triple 1 cr etc. During Q4 FI26, other expenses have gone up from rupes 6 to3 cr15 cr that is uh by rupees 492 cr which is mainly due to the increase in provision by rupees 173 cr in insurance expense by rups 154 cr in losses out of insurance claim by rupees 66 cr increase in rnm expense by rups 40 cr etc. During FYI26, tax expenses have come down from rupees 135 cr to negative rupees 327 cr that is by rupees 1682 cr due to deferred tax adjustment and recognition of matt credit. During Q4 FY26 tax expenses have come down from rupees 247 cr to negative rupees 1823 cr that is by rupees 2070 cr due to defer tax adjustment and recognition of matte. During FI26 we have earned profit after tax of rupes 376 cr as against rupees 3007 cr of corresponding previous period which is up by rupees 759 cr or 25% approx and the reasons for decrease or increase in the line items we have just discussed during Q4 FI26 we have earned profit after tax of rupees 1460 cr as against rupes 854 cr of corresponding previous period which is up by rupees 606 cr or 71% approx and the reasons for decrease uh public increase in the line items we have just discussed during FY26 the incentives positions are as under FY26 secondary energy 570 cr based incentive 297 crviation charges 46 cr total 913 cr and in the corresponding FI25 secondary energy was 545 crb based incentive 269 cration 51 cr total 865 cr during Q4 FI26 the incentives position R as under Q4 FI26 secondary energy 109 cr PA best incentives 245 crores deviation charges 12 crores total 36 crresponding Q4 FI25 the position was secondary energy 1 to4 crores PA based incentive 217 cration charges 9 cr total 35 50 cr.

22:05 Capex during FY26 is is rupees 13689 cr as against rupees 11596 cr in the corresponding period of previous year on consolidated basis. The board of directors has recommended the payment of final dividend at the rate of 2110% that is 21 pip per equity share in addition to interim dividend at the rate of 14% that is rupees 1.40 40 per equity share resulting in total dividend at the rate of 16.10% that is rupees 1.61 61 rupees per equity share on the face value of paid up equity shares of rupes 10 each for the financial year 2526.

22:45 Other major highlights of the company on realization front NHPC has received rupees 1049 cr from the beneficiies against sale of energy during FI26 as compared to rupees 9943 cr in the corresponding period of previous year. Trade receivables as on 31st March 26 stands at rupes 2630 cr as against rupes 2573 cr as on 31st March 25. This includes rupees 1887 cr as unbuild dattors as on 31st March 26 as against rupees 1587 cr as on 31st March 25. The net receivables out of total reported trade receivables as on 31st March 26 are as under uh reported trade receables 2630 cr and less unbuild datas 1887 crores build receivables 743 crores less datas dues converted into installments under lexity late payment search charge rules and other orders 39 cr net amount due 704 CR dues more than 45 days 242 crores. This is all from my side. Now the forum is open for Q&A. Thank you.

23:58 >> Thank you very much. We will now begin the question answer session. Anyone who wishes to ask a question may press star N1 on the touchstone telephone. If you wish to remove yourself from the question queue, you may press star N2. Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question Q assembles. We have first question from the line of Mohit Kumar from ICC Securities. Please go ahead.

24:30 Good afternoon sir and thanks for the opportunity. My first question is sir is it possible is it possible to share the adjusted pad for the quarter and what was the profit in three and pi to pi 2 in Q4 and the fiscal >> yeah you have seen the reported path so if you want to reach at adjusted path as DF has shared with you that there was one of tax adjust adjustment in DTL because we all know that uh We have opted for the lower tax resign of 25% under section 115BA as MAT credit facility is going to be discontinued uh FY27 onwards right so we have opted for 25% of tax res and therefore whatever uh uh deferred tax liability we had created at higher rate that needs to be restricted at 25%. So their impact is around 11 56 cr which we have already reported or shown under note number 8 or upper financial result.

25:40 So net impact of this uh detail adjustment deferred tax liability adjustment comes to around 900 cr. So if you reduce 900 cr from the reported path you will arrive at adjusted pad. That is the one uh adjustment you have to carry out in our reported pad with our adjusted pad. Understood that proof of standalone also console also right >> of course of course. >> Yes sir. So what is the profit in three and pi 2 in Q4 and the fiscal we understand that the path falls lower to a right for this one and pi 2 and what is the status of petition of those those two assets. Yeah.

26:18 >> Yeah. So far uh the profitability of Parvati 2 and SLP is concerned, we have earned 104 cr of profit from Parvati 2 in Q4 and 487 uh cr of profit from SLP in Q4. On yearly basis, Parvati 2 has given a loss of 150 cr whereas on yearly basis basis SLP has given total profit of 495 cran right sir >> three yeah >> yeah profit okay understood why why last question why the claw three it seems to has been shut for last few quarter last few months is there any particular reason >> yeah actually The maintenance is going on there and the these units are likely to be resumed very soon.

27:13 Understood that >> already resumed. Already resumed. >> Okay. Understood sir. Thank you and all the best sir. Thank you. I'll come back in the queue. Thank you. Thank you. We have next question from the line of Anik Mittal from SBI mutual fund. Please go ahead. >> Thank you. Just a a follow up on the previous question actually. Um so you said that Parvati reported a profit in fourth quarter versus a loss for the full year. What's leading to the profit improvement?

27:46 >> Yeah. So basically you know at the end of the financial year we compute the shortfall of energy which we are supposed to recover. So in Parvati 2 we have shortfall of energy to the extent of 200 cr. So that has been you know booked under revenue. That is the reason Parvati 2 has given you know uh the profit profit of 104 cr in Q4. >> Okay. And uh what is the percentage at which we are billing Parvati? Now Parvati and >> so we have already started billing of Parvati 2 based on the notification of CRC the interim tariff notification. So 75% billing we are already doing there.

28:26 And in case of subansir, >> subscri we are waiting for the you know interim tariff notification of CC and we'll be starting it once we get the tariff notification interim tariff notification of soil lower. >> Okay. But currently till the time the interim has come in what what what is the billing looking like? because you you >> we cannot we have been see we have been booking our revenue uh based on the 80% of the total expected AFC in Swans lower and Parvati to both but billing we can start only after getting inim tariff order from CRC understood so so now the billing for poverty is 75 and and just just on the um the tariff adoption I know the hearing for poverty has been has been delayed u When do we see these tariff tariff adoption come through for both Subsri and Parvati?

29:23 >> Uh yeah Nik we are just uh we have the next hearing date of Parvati 2 on 25th of this month only. So there we are expecting that the orders will be reserved and the final hearing has already been taken place. So information has already been provided. So hopefully uh on 25th of May this month uh this interpretation uh hearing will be complete and the order will be reserved and we will be we'll be expecting the final orders in in a month or so by the end of this quarter >> and Subri we've done the tariff filing.

29:58 Yes, once we have uh we have already filed the tariff petition and we are expecting intraim tariff order first thereafter there will be an hearing for provisional order like in case of parvati to uh first in order was issued by CRC wherein we after that we we have been able to bill at the end of 75% of the file tariff similar in case of uh subcri will be issuing this entry order first and thereafter we are expecting in another uh 6 months or so after this in tariff is issued by CRC in respect of subsc if if you were to build at 75% of revenue what's the under recovery on on profits that comes through >> no is the expected profit >> see the point is that just Mr. Sroj has said that we are booking the revenue at 80% of the tariff filed with the CRC because as per our best estimate in any case we are not booking taking a conservative approach we are booking at the rate of 80% of the revenue and 75% is just for the billing part once this order is there and uh in caseh our expect our expectation is not less than 80% in case there is a higher probability in that case we'll book the difference and along with interest the total billing will be done at that point of time after the order is issued. So man just to reply your question uh see so far we have booked 1320 cr of revenue in palvati 2 at 80% of the AFC if you gross up this 1320 you will arrive at somewhere 16 o 1600 odd cr so there is a under recovery of 300 cr uh if you look at the file tariff petition of parvati 2 so 300 cr kind of under recoveries in parvati 2 and similarly if you calculate the total AFC of swans lower also there also we have 150 cr kind of under recovery so altogether parvati 2 and swans lower 450 cr of revenue has not been booked in our book of accounts if you look at the tar petition filed in respect of these two projects >> understood fairly clear um and just on ta 5 um um I I just just recolct what's been the impact of ta this year and um just to clarify there's no insurance coverage over here anymore. Uh when do we expect that project to restart as well?

32:32 >> Yeah. So there is no I mean no revenue only expenditure has been there in Tista 5. So there is nothing topline contribution from Tista 5 but going forward we are very much sure that June onwards we are going to have operation uh uh to get resumed in respect of Tista 5. So June onwards you can see some topline activity in Ta 5 also. >> Okay. >> Yeah. >> Okay. >> End of June. >> And the under recovery full year would have been how much? Um in Ta 5.

33:03 >> So in respect of this five we have total AFC of around 500 cr. So if you exclude the tax element it would be around 400 cr. So and just a clarification this 150 cr of recovery in subans is for how many units? three units that I I'll uh you know come back for for any further questions. Thank you. >> Thank you. >> We have next question from the line of Morta from Kek. Please go ahead.

33:34 Yeah, a lot of my questions were related to Paragu and Sabansuri, but uh just to understand this correctly when uh you know you talk about a 1600 cr revenue for Papa 2 uh is it reasonable then to say that that 150 cr loss which you have for 26 would have been about a 150 cr profit. Is that the right way to think of it or there is anything? >> Exactly. Exactly. You have explained very correctly. >> Okay. And uh just to understand on this fourth quarter where you talked about booking the additional revenue because of the shortfall in generation but does that still come within so is it fair to say that in your reported financials for Parvati 2 for instance you've accounted 1320 K of revenue or um is it slightly more because of that additional 200 K that we talked about >> that includes 200 as well >> 1320 includes 200 as well >> of Okay. Okay. Thank you.

34:36 >> Thank you. We have next question from the line of Ragn Pande from Ara Capital. Please go ahead. >> Yeah, I have a question on PSP. So from which year we can see the commissioning of your PSP projects and what is the realizations for what will be the realization for these plant and uh the capex for these projects. Yeah. So we have not started any construction of PSP project. So it is very early to say about realization everything because our the uh you can say that the fastest running project in the ambit of this PSP project is Omares Indra Indra Saga 640 megawatt watt project. So there we are expecting to start construction activities during the current fiscal and once we get all those uh everything in place and we start construction activities we will have better clarity about the realization their tariff and everything. So uh give us a time to share more facts about this unconas saga.

35:47 Yeah. And uh as a reia are you seeing any slowdown in your renewable tendering this year and there was a backlog of uh around 40 gawatt in PPA signing. So any uh improvement on that? >> Yeah. So we have not done any tendering uh in last recent past. So whatever tendering we had made we have already awarded around 23 gawatt kind of capacity out of which 13 gawatt kind of likely PPA and PSA signing we are hoping out of which 7 gawatt approx we have already signed. So going forward we will have again have more clarity in days to come or months to come in respect of RIA projects also.

36:30 >> Okay. And on the uh generation front are you expecting any slowdown in generation given uh this is a elino year and there are expectation of slower monsoon uh of a weaker monsoon this year. >> No no so as you are aware you have been tracking NSPC for years. Most of our power station are snowfed. So certainly good monsoon will be helping us for better generation. But our generation currently also it is going fairly well. So nothing to worry from the generation perspective.

37:00 And just one last thing on your uh I want to know the normative PF of your plants. >> Yeah. So consolated it is 82%. Normative normative it is 80%. >> Uh okay. And so this year the overall PLF was uh less than 70 uh 80% right. So >> yeah. So there are two things. If you look at the actual PF with Tista 5 it is certainly lower 75%. But if you exclude this five it is 80%. So this five has not contributed anything during the fiscal last fiscal as well as the corresponding fiscal. So in both the fiscal if you exclude this five you will get 80% kind of PF but if you include this five certainly it is 75%.

37:49 >> Yeah. Okay. Thank you. >> Thank you. We have next question from the line of Priya Mata from Equitas Investment. Please go ahead. >> Uh thank you so much for giving me the opportunity. Uh so my first question is in terms of what will be your equity value for next year and uh till FI20 if you could just help me for the next couple of years. >> Yeah. So you are I think you are talking about regulated equity.

38:19 >> Yeah. >> Yeah. So current regulated equity including parvati 2 is 18,300 uh right 18,300 cr. Now in next financial year if you consider the cap city addition we are having capity addition from 1250 megawatt of suansry out of which 250 megawatt we have already commissioned. So balance,000 megawatt would be coming from suans. Then we have 120 megawatt Rangit 4. Then 1,000 megawatt of Pakal, 624 megawatt of Kiru. So all these hydro assets we are going to commission 2,994 megawatt in fiscal FI27. Apart from that we have 1190 megawatt of solar assets also which are going to be commissioned in the current fiscal. So altogether if you look at the hydro regulated equity by end of FI27 it would be 30,627 cr.

39:20 >> Okay. >> Thank you. >> Hello. >> Yeah. Yeah please. >> Uh yeah. Uh so my second question is in terms of how what kind of cost increase are we seeing and uh do we have a methodology that we can uh pass on the cost or this will just increase my regulated income >> construction cost. >> Yeah sure. >> Uh as far as this increase in construction cost is concerned being a basically CRC uh this being a cost plus everything is allowed by CRC. uh once it's out of our control beyond our control things are all passed on. So there is no such concern as far as this is concerned but yes we are definitely uh we are having checks and balances regarding how the cost can be kept in check and we just ensure that just because of certain reasons beyond our control like geological surprises sometime there are design changes and other events happen in the project site.

40:21 So definitely there there are some increase but in any case all those increases taken care of as per the regulations whatsoever cost beyond our control that is definitely allowed by uh the CRC. So we don't have any issues on that front. >> Okay. And what is the reason for a negative regulated income for this quarter? >> Yeah you were talking about regulatory def. >> Yeah regulated income. >> Yeah. So that is basically as we have discussed in our opening remark there has been reversal of 1156 cr of DTL in the line in the line item of deferred tax liability. So similar kind of reversal we have to make under rate regulated asset also. So that has been reflected under regulated deferral account. So their their impact is there basically.

41:13 >> Okay. Got it. >> So this this we have disclosed in note number eight of our financial results. So that will uh yeah that is taking care of this concern >> right and what will the maximum volume growth can we say from the in terms just from the number of unit perspective for the next year >> please come again uh please be little bit louder uh we are not able to hear hear you out loud and clear >> yes with the sansri uh all the three units functioning and parati also coming and staring what is the kind of volume which uh number which you'll see for the next year if it could help us.

41:52 >> Yeah. So as of now four units have already been commissioned. The design energy of this project is 7,421 million units and going forward more units are are coming in phased manner. So if you look at the expected generation of Suri Lower, we are expecting somewhere 5,000 million unit to 5,500 million units of generation from Sansri Lure. No correction. >> This is incremental for FI27, right?

42:24 >> Yeah. This is the expected generation from Swans lower. Not incremental. Incremental we have seen generation of 56 million units in Swans lower during the last. >> Got it. Thank you. Comment. >> Yeah. >> Thank you. We have next question from the line of Akash Ma from Kendra HSBC live. Please go ahead. Uh hi sir uh thanks for taking my question. So first question is on uh so can you just help us again with the timeline in terms of the uh the CRC tariffs that you have mentioned for Parbati and for uh Sububansari both and uh if everything goes well from when can we see uh this the I mean the recognition of revenue at 100% for both of them. Uh yeah Akash as as I already uh explained to petition is in the final stage of fairing and we are expecting orders from CRC by the end of this quarter by 30th of June. So once the order comes for after that you you said that you will take some I mean around few months after which you can recognize it or immediately it's from the >> no no as far as recognition is concerned in case the order comes within quarter then we will uh definitely account for the differential revenue along with interest component also because interest is allowed from the date of cood in that case we'll be uh doing we completely we will be billing part will be over and we will be recognizing the revenue in the in this quarter itself. if the order comes. So as far as recognition is concerned, there is no deferral.

44:03 >> Sure. And similarly for Sububanri, you said around five after five to 6 months, I mean we could expect. >> Yes. >> Subansri, we have already filed the petition for our intim tariff. So first we are just waiting how much interim tariff CRC is going to allow us and thereafter uh in subsequent hearings we are expecting it just an expectation like in case of Parvati to after interim we are expecting that within 3 to four months but in case of subantri we are taking because this is an old very old project. So we expect that not more than 6 months CRC will take to issue the final orders. In that case we'll be having a fair idea of where we are going landing in terms of revenue. As of now we are booking 80% 80% of the revenue in ter of the AFC tar predation which we have filed >> and this subsritory it will be for the entire capacity right that what whatever >> yeah basically yeah subscri like we have filed for three units which were commissioned and as the units adds on we will be uh we will be filing supplementary tariff petitions with CRC we'll keep on updating >> so CRC on projected basis yeah CRC will be allowing us on projected basis also but once all the units are complete the final petition will be filed at that point of time but in that case the CRC will be allowing us intim tariff for billing purpose also >> okay for the so so for the three units maybe something to the final order comes through >> then you can start recognizing it for subsur right >> yes >> okay and just the second question is on are there any anything else in terms of the future projects other I mean Pakard or Kiru or or any other project where you are seeing cost escalation where something similar could kind of happen or >> yeah so see a cost escalation in hydro project are very inherent you cannot rule out even though if there is no time overrun there will be cost overrun because you know when we award at a cert particular price level that award cost is not freezed that is basically at a particular ular price level. So if you are going forward with that award for four, five, six years, you have to pay the price variation. So cost of RN is very inherent in any hydropower project.

46:20 Right? Now if any time of is there that can also lead to cost over. So that varies project to project. So it is not necessary that every project will have their time overrun. There are many projects which we have commissioned in past ahead of schedule also. So it is not that every project will see its time overdone. So it depends you know and accordingly based on the factor as we have discussed the CRC beyond the control of the management within the control of the management two broad factors are there based on which CRC allows the cost overrun.

46:55 >> Uh sure so that's helpful. So, so any of the future projects are facing like so or that they are facing material changes in cost or it's not >> no it is it is I mean not material because like project like pakal kiru cover these projects are doing uh pretty well and whatever timeline we have shared with you we are going to commission these projects by that timeline so uh nothing extraordinary you will find there >> okay okay that's quite helpful Thanks a lot.

47:29 >> Thank you. We have next question from the lineup. Mohit Kumar from ICIC Securities. Please go ahead. >> Yeah, thank you. Thank you for the opportunity once again. Uh my first question what led to profit for three in the quarter given that the path and generation is lower in the quarter and also your booking in the t booking at lower tariff right have you booked any shortfall in generation in ini also >> no so moit we need to understand that you know whatever of any project we file that is basically based on the capital cost of the project if we are going to ERC with the original cost of the project without any deduction. Right?

48:15 And then whatever expected AFC is there from that particular project the cost uh the I mean whatever generation we have I mean 56 million units of generation we have from Swansri in the last fiscal. So their income has been booked corresponding to the capital cost of these units which we have commissioned. Right? So if you are taking the entire capital cost of those units for example if we have commissioned three units of swans there corresponding capital cost is coming around 20,000 odd cr. Now if you take tariff based on 20,000 cr of capital cost and if you multiply the number of units generated then certainly this is the top line and apart from that whatever actual expenditure has been there after that you are going to have profit. If any cut is there in the top line and expenditure are coming 100% then only you will look at some losses and everything. But if revenue and expenditure both are compatible to each other in line with the AFC component, why any why any loss would come?

49:24 Um this is my question because you're booking at a much lower tariff. That's the reason I'm asking whether >> no. So we have not taken any much lower tariff only thing we have done 80% of the AFC and there you know if you gross it up then 150 cr of recovery we have seen in swans lower which we have discussed. >> Understood. Understood. My second question why shortfall in generation has been booked in Parvati too. Are we going to argue for lower design energy for the power plant?

49:53 >> No, it is too early to argue for the lower design energy. Parvati has seen only one year and that two you have seen that some cloud bus issue and everything had incurred there in Parvati to in the early uh I mean just one year back early monsoon. So uh for challenging the what you call design energy you have to wait for at least 3 years. >> Yeah. >> Then then how can you book the shortfall in generation is it allowed and then they see another regulation.

50:22 >> Yeah. Yeah it is allowed. It is allowed. >> Yeah. Basically shortfalling generation uh regulation allows us in case we are not able to achieve design energy and the reasons for non-achievement are beyond our control in that case uh CRC regulation allows us even to bill so in that case uh uh after this order is there 75% we are having order of interim tariff 75% we are going to bill that with we are going to bill that too at the rate of 75% of the tariff tariff filed so this is as per regulation what we are doing. Uh so yeah there is no issue we we are going to build and get from benefici. And why is that? This the lower dam this the lower dam three and this the lower dam uh power 4 TP3 and T4 is has has shown lower path in the quarter. Is there any particular reason are they impacted by >> yeah if you remember 23 events where we got heavy damages in Tista 5 these these flash floods had impacted our TLDP 3 and TB4 projects also. So a lot of silt issues are there which we are trying to remove. Uh we are trying to come out of this issue. Last year also we had carried out uh some uh you know process to remove the seal and all but but again it has accumulated. So that issues we are now basically facing with and hopefully we'll be able to come out of this issues within 3 months I believe.

51:58 One more question which are the power plants you're likely to tender in this fiscal is it is it possible to give some uh so my question is the s code kamlas swans upper Italian all these four will get tendered out this fiscal or do you think two will this two next fiscal >> yeah we are also thinking from the same uh line and hopefully we are able to do it uh >> yeah actually we have a target to bring five projects uh of hydro during this con bring into construction phase during this financial year.

52:32 >> We have two have already been awarded then UD1 stage two and uh this Dulasi stage two and three more projects like Italian and then Saval Court and then Kamla. These three are also likely to be bring into the con construction stage during this financial year. And one more PSP also we are targeting to bring into the construction state that that is Indra Saga and Omareshwar. Any any uh uh any update on Sui upper sir?

53:04 >> Suans upper uh we may not be going this year next year we may be going for that. >> Understood sir. Understood sir. Thank you sir. Thank you. Thank you. >> Thank you. We have next question from the line now. Morta from Kek. Please go ahead. Um, >> hi. So, I just wanted to just to reconfirm you know when you talked about Parvati 2 doing a full year profit of 150 cr isn't that less against the regulated equity and project cost of parati 2 like taking 150 cr as the normalized profit. Uh, that's number one. Number two on subansir low. So when you talked about that 80% revenue given that you only part commission the capacity you're well within the 80% and therefore you're booking the whole revenue for these early units. Is that understanding correct?

53:56 >> Yeah. So uh let me take your question first from Parvati 2. So Parvati 2 as we have shared that uh the revenue which we have recognized to Parvati 2 is 1320 K. Right? Now if you take the >> entire generation uh I mean the design energy of Parvati 2 is 3125 million units whereas we have actually generated 1642 million units in FY26.

54:28 So your your if your generation is not there you have not been able to book the entire revenue expected revenue of parati 2 that is the reason you have not achieved the expected pack level of parvati too it is clear >> now coming back to the generation >> yes yes so we have shared earlier also that in parvati too there was some cloud brush issue in somewhere uh June or July last year I believe So that has basically I mean stopped the expected generation of parvati 2. Now yeah so now swansri lower if you take a if I take your question for suansry lower also we have shared that 80% of the revenue we have recognized that is around 613 cr only right so total revenue against the 506 million units is 613 cr only that is 80% of the expected AFC if to gross it up you will find 150 ka under recovery in small lower also you know >> okay okay >> I think this is this is the >> it's two it's two things one is the the actual generation is still much lower than the design energy therefore the revenue is low and then it's at 80% of that so even lower >> exactly exactly Okay.

56:16 >> Ladies and gentlemen, due to time constraint, that was the last question. I now hand the conference over to Mr. Rupes Sen for closing comments. >> Yeah. So we thank NHBC management for giving us an opportunity to host this call and we also thank all the investors and the analysts for joining this call. >> Uh thank uh on behalf of NHPC I would like to convey my thanks. Thank you so much all the investors. Thank you >> ladies and gentlemen on behalf of Lara Securities India Private Limited. That concludes this conference. Thank you for joining us and you are disconnected lunch. Thank you.

Summary

NHPC Limited's Q4 FY26 earnings conference call highlighted a significant increase in power generation and revenue, driven by new project commissions. The company reported a 12% rise in revenue from operations and a 25% increase in profit after tax compared to the previous year, despite some operational challenges.

- NHPC generated 29,619 million units in FY26, a 16% increase from the previous year.
- Revenue from operations reached ₹11,615 crore, up from ₹10,380 crore.
- Profit after tax for FY26 was ₹3,766 crore, a 25% increase year-over-year.
- Key projects include the commissioning of four units of the Subansiri Lower project and the Karnisar solar power station.
- The company is pursuing several new projects, including the Indra Omareshwar pumped storage project and various hydroelectric projects in Jammu and Kashmir.
- NHPC's plant availability factor (PAF) for FY26 was 74.75%, down from 78.87% in the previous year.
- The board recommended a final dividend of 21% in addition to an interim dividend, totaling 36.10% for FY26.
- Challenges included maintenance shutdowns and lower generation at some plants, impacting overall performance.